Download Print this page

Installation Steps - BenQ CM00G2 Installation Manual

Ceiling mount
Hide thumbs Also See for CM00G2:

Advertisement

Installation Steps

1. Installing mount bracket on the ceiling
A. Pull out the plastic caps from both sides. Make sure the
ceiling mount bracket (A) is placed on the correct position on
the ceiling. Place the bracket (A) close to the ceiling and mark
on the wall against the bracket holes with a pencil.
Drill holes on the marked points.
The holes on a concrete wall should be 10mm (0.39") in
diameter and 55mm deep (2.17") while the holes on a
wooden wall should be 4.5mm (0.17") in diameter and 55mm
deep (2.17").
Use a hammer to fix the plastic plugs (L) on the wall.
Fix the self-tapping screws (M) on the wall. Replace the plastic
caps.
2. Installing arm bracket on the projector
A. Place the arm bracket (F) on the projector.
Use the fix bolts with fixed washer (I) to lock the
projector tightly.
3. Installing hinge module on the projector
A. Place the hinge module (B) on the arm bracket (F).
Lock them tightly with the fixed washers (J) and nuts (K).
B. Place the hinge module cover (C) on the hinge
module (B). Align the hinge module (D) with the
holes on the hinge module cover (C) and tighten it
by inserting into the holes.
C. Use the hex key 5mm (H) to insert and fix the hex
bolts (M6xL12) (G) into the holes of the hinge
module (B) and the hinge module cover (C).
4. Installing internal and external pipe devices
A. After passing the power cord through the internal
pipe (O), fix the internal pipe (O) and the projector
with the locked hinge module with the hex bolts
(M6xL12) (G).
B. Pull out the power cord from behind the external
pipe (N) and plug the power cord into the projector.
Assemble the external pipe device (O+projector)
and the external pipe (N) with the bolts
(E) and the nuts (K) at an appropriate length.
4 Installation Steps
A
1.
A
B
3.
A
3.
4.
B
4.
A
L
A
M
2.
K
B
J
B
F
C
D
C
B
O
G
N
O
K
I
F
H
E

Advertisement

loading