Toshiba RAV-SM562XT-E Installation Manual page 18

Hide thumbs Also See for RAV-SM562XT-E:
Table of Contents

Advertisement

7
EVACUATING
Compound pressure gauge
–101 kPa (–76 cmHg)
Handle Lo
Charge hose
(For R410A only)
Service port (Valve
core (Setting pin))
Packed valve at gas side
<For RAV-SM562AT-E model>
Compound pressure gauge
–101 kPa (–76 cmHg)
Handle Lo
Charge hose
(For R410A only)
Packed valve (Gas side)
Service port (Valve core (Setting pin))
Valve unit
Charge port
Pressure gauge
Manifold valve
Handle Hi
(Keep fully closed)
Charge hose
(For R410A only)
Vacuum pump adapter for
counter-flow prevention
(For R410A only)
Vacuum
pump
Pressure gauge
Manifold valve
Handle Hi
(Keep fully closed)
Charge hose
(For R410A only)
Vacuum pump adapter for
counter-flow prevention
(For R410A only)
Vacuum
pump
Flare nut
Stopper
Charge cap
Valve rod
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rav-sm802xt-eRav-sm562at-eRav-sm802at-e

Table of Contents