Desa HL18N Owners Manual And Installation Manual page 13

Desa hl18n; hl18p; hl24n; hl24p; vsb18n; vsb18p; vsb24n; vsb24p unvented (vent-free) gas log heater
Table of Contents

Advertisement

CONNECTING TO GAS SUppLY
WARNING: This appliance
requires a 1/2" NPT (National
Pipe Thread) inlet connection to
the pressure regulator.
WARNING: A qualified ser-
vice person must connect heater
to gas supply. Follow all local
codes.
CAUTION: Never connect
propane/LP heater directly to the
propane/LP supply. Propane/LP
heaters require an external regu-
lator (not supplied). Install the
external regulator between the
heater and propane/LP supply.
WARNING: For natural gas
units, never connect heater to
private (non-utility) gas wells.
This gas is commonly known
as wellhead gas.
Installation Items Needed
Before installing heater, make sure you have
the items listed below.
• external regulator (supplied by installer)
• piping (check local codes)
• sealant (resistant to propane/LP gas)
• equipment shutoff valve *
• test gauge connection *
• sediment trap
• tee joint
• pipe wrench
* A CSA design-certified equipment shutoff
valve with 1/8" NPT tap is an acceptable al-
ternative to test gauge connection. Purchase
the optional CSA design-certified equipment
shutoff valve from your dealer.
For propane/LP gas, the installer must supply
an external regulator. An external regulator
will reduce incoming gas pressure. You must
reduce incoming gas pressure to between 11"
and 14" of water. If you do not reduce incom-
122136-01C
INSTALLATION
Continued
ing gas pressure, heater regulator damage
could occur. Install external regulator with
vent pointing down as shown in Figure 13.
Pointing vent down protects it from freezing
rain or sleet.
black iron or steel pipe. Inter-
nally-tinned copper tubing may
be used in certain areas. Check
your local codes. Use pipe of
1/2" diameter or greater to allow
proper gas volume to heater. If
pipe is too small, undue loss of
volume will occur.
Installation must include an equipment shutoff
valve, union and plugged 1/8" NPT tap. Locate
NPT tap within reach for test gauge hook up.
NPT tap must be upstream from heater (see
Figure 14, page 14).
IMPORTANT: Install equipment shutoff valve
in an accessible location. Main gas valve is
for turning on or shutting off gas to the ap-
pliance.
Check your building codes for any special
requirements for locating equipment shutoff
valve to fireplaces.
Apply pipe joint sealant lightly to male NPT
threads. This will prevent excess sealant from
going into pipe. Excess sealant in pipe could
result in clogged heater valves.
sealant that is resistant to liquid
petroleum (LP) gas.
Propane/LP
Supply Tank
Figure 13 - External Regulator With Vent
www.desatech.com
CAUTION: Use only new,
WARNING: Use pipe joint
Pointing Down
External
Regulator
with Vent
Pointing
Down
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hl18pHl24pHl24nVsb18nVsb18pVsb24n ... Show all

Table of Contents