Drain Exiting Right Side; Counterflow Model Installed Horizontally; With Right Side Down; With Eft Ide Own - Amana MSS9 Installation Instructions Manual

Single-stage gas furnace
Table of Contents

Advertisement

D
E
R
S
RAIN
XITING
IGHT
IDE
1. Remove hose clamps and hoses from trap.
2. Remove trap.
3. (Draining the Vent Elbow) Insert the non-grommet
end hose #10 into the cabinet back drain hole. Secure on
vent – drain elbow barb fitting with a red clamp.
4. Insert 100º elbow into the cut end and secure with red
clamp.
5. (Draining the Collector Box) Insert non-grommet end of
hose #9 into the
cabinet front drain hole and secure on collector box drain
port with a silver clamp.
6. Mate the drain trap inlets to the hoses and secure with
silver clamps.
7. Line up the trap mounting holes with the pre-drilled holes
in the furnace and secure with 2 screws removed in step
2.
8. Refer to Field Supplied Drain section for instructions on field supplied / installed drain on outlet of furnace trap.
C
M
I
OUNTERFLOW
ODEL
NSTALLED
S
D
IDE
OWN
Minimum 5 1/2" clearance is required for the drain trap beneath
the furnace.
*Also see Front Cover Pressure Switch Tube Location on page 10.
1. Remove hose clamps and hoses from trap.
2. Remove trap.
3. (Draining the Collector Box) From outside the cabinet, insert
the non-grommet end hose #8 into the back drain hole.
4. Secure to collector box drain port using a silver clamp.
5. (Draining the Vent Elbow) From outside the cabinet, insert
the non-grommet end of hose #7 into the front cabinet drain
hole and secure on the vent – drain elbow barb fitting using a
red clamp
6. Mate the trap inlets to the hoses, the outlet of the trap must
face the original bottom of the furnace. Secure with silver
clamps.
7. Fasten the drain trap to the cabinet with two screws removed
in step 2
8. Refer to Field Supplied Drain section for instructions on field
supplied / installed drain on outlet of furnace trap.
C
M
I
OUNTERFLOW
ODEL
NSTALLED
S
D
IDE
OWN
Minimum 5 1/2" clearance is required for the drain trap beneath
the furnace.
1. Remove hose clamps and hoses from trap.
2. Remove trap.
3. Remove plugs from left side of cabinet and install in blower
deck.
H
R
ORIZONTALLY WITH
IGHT
H
L
ORIZONTALLY WITH
EFT
Hose #4
22
Figure 25
Hose #7
Hose #8
Figure 26
Hose #4
Hose #5 x2
Figure 27
Drain Port

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Css9

Table of Contents