Trane 4TTX8024A Installer's Manual page 19

Condensing units
Hide thumbs Also See for 4TTX8024A:
Table of Contents

Advertisement

STEP 2 - Determine the final subcooling value using total Line Length and Lift measured in STEP 1 and the charts below.
2 Ton Unit
SUBCOOL CHARGING CHART CORRECTIONS TABLE
60
50
25 ft. Maximum Lift
40
30
25
20
15
10
0
Use design subcooling
10
20
TOTAL REFRIGERANT LINE LENGTH (FT)
4 Ton Unit
SUBCOOL CHARGING CHART CORRECTIONS TABLE
60
50
25 ft. Maximum Lift
40
30
25
20
15
Add 1º
10
0
Use Design Subcooling
10
20
TOTAL REFRIGERANT LINE LENGTH (FT)
Design Subcooling Value = __________º F
(from nameplate or Service Facts)
Subcooling Correction = __________º F
Final Subcooling Value = __________º F
STEP 3 - Stabilize the system by operating for a
minimum of 20 minutes.
At startup, or whenever charge is removed or
added, the system must be operated for a mini-
mum of 20 minutes to stabilize before accurate
measurements can be made.
18-AC95D1-1
o
Add 3
o
Add 2
o
Add 1
25
30
40
60
Add 3º
Add 4º
Add 2º
Add 3º
Add 2º
25
30
40
60
3 Ton Unit
SUBCOOL CHARGING CHART CORRECTIONS TABLE
60
50
25 ft. Maximum Lift
40
30
25
20
15
o
10
Add 1
0
Use design subcooling
10
20
25
TOTAL REFRIGERANT LINE LENGTH (FT)
5 Ton Unit
SUBCOOL CHARGING CHART CORRECTIONS TABLE
60
50
25 ft. Maximum Lift
40
30
25
20
15
Add 1º
10
0
Use Design Subcooling
10
20
25
TOTAL REFRIGERANT LINE LENGTH (FT)
20 MIN.
o
Add 3
o
Add 2
o
Add 1
30
40
60
Add 4º
Add 3º
Add 2º
Add 2º
30
40
60
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

4ttx8060a4ttx8036a4ttx8048a

Table of Contents