Sentry S-34 Installation And Operating Instructions Manual

Hot water models s-34 through s-150 gas-fired cast-iron boilers for natural and l.p. propane gases

Advertisement

SENTRY
GAS-FIRED CAST-IRON BOILERS FOR NATURAL AND L.P . PROPANE GASES
INSTALLATION AND OPERATING INSTRUCTIONS
CONTENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PAGE
Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,3
Boiler Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Boiler Foundation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Chimney Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Minimum Clearance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Draft Hood . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Vent Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Vent Damper Installation . . . . . . . . . . . . . . . . . . . . . . . . . . 4,5,6
Gas Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Electrical Controls and Wiring . . . . . . . . . . . . . . . . . . . . . . . . . 6
Boiler Water Temperature Control . . . . . . . . . . . . . . . . . . . . 7-9
Multi-zoning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-11
Sequence of Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Boiler Room Air Supply and Ventilation . . . . . . . . . . . . . . . . 13
Water Piping at Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Filling and Venting Water Systems . . . . . . . . . . . . . . . . . . . . 13
Burner Adjustment, Checking Gas Input. . . . . . . . . . . . . . . . 14
General Maintenance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Water Level Check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Annual Inspection and Cleaning . . . . . . . . . . . . . . . . . . . . . . 16
Safety Check for Control Systems . . . . . . . . . . . . . . . . . . . . 16
Protection from Freezing/Water Treatment . . . . . . . . . . . . . . 16
Keeping Area Clear . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Troubleshooting Guide . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Replacement Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Appendix A & B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Appendix C & D & E. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Heating Contractor
Address
Phone Number
HOT WATER MODELS S-34 THROUGH S-150
READ ALL OF THE FOLLOWING
WARNINGS AND STATEMENTS

INSTALLATION INSTRUCTIONS

The installation must conform to the requirements of the authority
having jurisdiction or, in the absence of such requirements, to the
National Fuel Gas Code, ANSI Z223.1-latest edition or CSA
B149.1 latest edition for natural gas and propane. The installation
must also conform to the additional requirements in this Slant/Fin
Instruction Book.
In addition, where required by the authority having juris dic tion,
the installation must conform to American Society of Mechanical
Engineers Safety Code for Controls and Safety Devices for
Automatically Fired Boilers, No. CSD-1 or CSA B149.1 latest
for natural gas and propane
edition
in the above requirements, then the more stringent requirement
will apply.
This boiler, gas piping and accessories must be installed,
connected, serviced and repaired by a trained, experienced
service technician, familiar with all precautions required for gas-
fired equipment and licensed or otherwise qualified, in
compliance with the authority having jurisdiction.
This manual must be left with owner and should be hung
on or adjacent to the boiler for reference.
Boiler Model Number
Boiler Serial Number
Installation Date
Printed in Canada 0713
Part No. 46-0528C
IMPORTANT
BEFORE READING THE
WARNING
SEE "WARNING" ON PAGE 3
FOR LIQUEFIED PETROLEUM (L.P .)
PROPANE GAS-FIRED BOILERS
. If there is any conflict
WARNING
Publication No. S-41
Revision B

Advertisement

Table of Contents
loading

Summary of Contents for Sentry S-34

  • Page 1: Table Of Contents

    SENTRY ™ HOT WATER MODELS S-34 THROUGH S-150 GAS-FIRED CAST-IRON BOILERS FOR NATURAL AND L.P . PROPANE GASES INSTALLATION AND OPERATING INSTRUCTIONS CONTENTS ........PAGE IMPORTANT Dimensions .
  • Page 2: Dimensions

    Sentry Install manual gas main shutoff valve 1.52 m (5 Dimensions ft.) above floor, when required by local code. MODEL S-34 Install sediment trap and connect with ground joint union. Dotted piping by installing contractor. Install manual gas Dimensions main shutoff valve 1.52 m (5 ft.) above...
  • Page 3: Installation Requirements

    (7") (7-1/16") (5-7/8") Base Assembly B. For installation on non-combustible floors only. The Sentry Boiler Burners Combustible Floor Kit part number printed on the boiler rating plate is the only one to be used when installing on Pilot combustible floors. The boiler must not be installed on carpeting.
  • Page 4: Chimney Requirements

    Sentry CHIMNEY REQUIREMENTS SAFETY A. Sentry boilers may be vented into a masonry vitreous tile-lined KEEP THE BOILER AREA CLEAR AND FREE FROM chimney or type “B” venting system NOT EXPOSED to the OUT- COMBUSTIBLE MATERIALS, GASOLINE AND OTHER DOORS below the roof line.
  • Page 5 4. Restore electrical power and turn on gas supply. Figure 1. Vertical Installation of Vent Damper on Sentry “S” Boilers C. AFTER INSTALLATION: 1. Operate system through two complete cycles to check for opening and closing in proper sequence, and proper burner operation.
  • Page 6: Gas Piping

    Sentry At 6.1m (20 ft.) length of pipe, match required capacity from table below (choose higher capacity, in this case is FIGURE 5 5.4 m [190 cu. ft.] per hour). Required pipe size is 3/4". Improper gas pipe sizing will result in pilot flame outages, insufficient heat and other installation difficulties.
  • Page 7: Boiler Water Temperature Control

    Sentry HYDROLEVEL HYDROSTAT CONTROL MODEL 3200 THERMOSTAT ECONOMY LO TEMP HI TEMP MALE RECEPTACLE PLUG VENT DAMPER HARNESS L1 L2 C2 C1 B1 B2 I1 I2 HONEYWELL IGNITION MODULE 120V NEUTRAL 24V(GND) CIRCULATOR MV/PV ROLL OUT AND BLOCKED : PROVIDE DISCONNECT MEANS AND...
  • Page 8 Sentry I. BOILERS EQUIPPED WITH HYDROSTAT CONTROL Diagnostic LEDs and c i t Dynamic SETTING THE CONTROL Test Button Display Water Temperature and Real Time and R and R Jumper Verification of Setting c i f of f Adjustments. Economy Dial...
  • Page 9 Sentry LED LEGEND and TEST/SETTINGS BUTTON and the burner will shut down. The TEMP ACTIVE Indicates that the boiler water will continue to circu- Fuel Smart HydroStat control is powered late and heat the house as long as and that the temperature function is the thermostat call continues.
  • Page 10: Multi-Zoning

    Sentry Figure 8. Multizoning of Sentry boilers pump zoning system using R845A relay. Figure 9. Multizoning of Sentry boiler-2 zone system pump zoning system using R882A/B relays.
  • Page 11: Multi-Zoning

    Sentry Figure 10. Multizoning of Sentry boilers zone valve system using R8043E/F zone valves. IMPORTANT NOTICE This boiler is equipped with a feature that saves energy by reducing the boiler water temperature as the heating load decreases. This feature is equipped with an override which is provided primarily to permit the use of an external energy management system that serves the same function.
  • Page 12: Sequence Of Operations

    Sentry SEQUENCE OF OPERATION FOR SENTRY BOILERS THERMOSTAT CALLS FOR HEAT HIGH LIMIT CONTACTS CLOSED? CIRCULATOR ENERGIZED NO FURTHER LOW WATER CUT OFF ACTION CONTACTS CLOSED? VENT DAMPER RELAY ENERGIZED. VENT DAMPER MOTOR OPENS VENT DAMPER. END SWITCH CLOSES. IGNITION CONTROL ENERGIZED SPARK GENERATOR MODULE POWERED.
  • Page 13: Boiler Room Air Supply And Ventilation

    Sentry BOILER ROOM AIR SUPPLY AND VENTILATION capacity tank. Locate the tank near the boiler, as An ample supply of air is required to obtain combustion and illus trated. An automatic air vent should be installed in the ventilation. ALL AIR COMES FROM OUTSIDE, directly through top of the boiler or air purger.
  • Page 14: Burner Adjustment, Checking Gas Input

    Sentry 3. Venting is installed according to instructions under “VENT PIPING”. 4. All wiring is completed, following applicable wiring dia- grams. 5. Using soap solution, check for gas leaks in all gas piping from meter to boiler pilot and manifold. DO NOT use open flame.
  • Page 15: Care And Maintenance

    Sentry Example #2: a. Main burner ignition from cold start-repeat. b. Continued operation of main burner. For 8.70 W/m gas this becomes: c. Main burner ignition with appliance at maximum oper- Input = m metered in 3 minutes × 8.70 × 20 ating temperature after prolonged operation.
  • Page 16: Water Level Check

    Sentry NOTE-TO REMOVE BURNERS: F. WATER SYSTEM CHECK: 1. System to be full of water, and pressure to remain 1. Disconnect pilot at pilot mount, or disconnect pilot gas stable at correct setting on gauge. line at gas valve, before removing burners next to pilot.
  • Page 17: Troubleshooting Guide

    Sentry GENERAL TROUBLESHOOTING GUIDE FOR SERVICEPEOPLE BURNERS FAIL TO OPERATE CAUSE REMEDY 1. Safety pilot out, or flame too low. 1. Check, clean, re-light. See instructions. 2. Gas supply valve shut off. 2. Open gas valve(s). 3. Electric switch open.
  • Page 18: Replacement Parts

    Sentry IF REPLACEMENT PARTS ARE NEEDED parts should be identified by and ordered from Slant/Fin. When parts are needed, refer to boiler model and serial num- Relief/Safety valves must be ASME rated for the pressure and ber shown on the boiler name/rating plate.Whenever possible gross output of the boiler.
  • Page 19: Appendix C & D & E

    Sentry APPENDIX C Thermostatic Bypass Valve Thermostatic bypass valves type TV are designed to allow established. If flow is already to the system, no adjustment boilers to reach their optimum operating temperature is required. quickly and to prevent cool/cold return temperatures from Return Mounting: On the return "TV"...
  • Page 20 SLANT/FIN LTD/LTEE, 6450 Northam Drive, Mississauga, Ontario L4V 1H9 • Phone: (905) 677-8400 / FAX: (905) 677-1829 / Order Desk Fax: (905) 677-9015 www.slantfin.ca / E-mail: orderdesk@slantfin.ca / info@slantfin.ca...

This manual is also suitable for:

S-60S-90S-150S-120

Table of Contents