14 Monitoring The Operation Data By The Remote Controller - Mitsubishi Electric PUHZ-P100VHA2 Service Manual

Mitsubishi electric split-type, heat pump air conditioners
Hide thumbs Also See for PUHZ-P100VHA2:
Table of Contents

Advertisement

14 MONITORING THE OPERATION DATA BY THE REMOTE CONTROLLER

14-1. HOW TO "MONITOR THE OPERATION DATA"
14-1-1. PAR-31MAA
Details on the operation data including each thermistor temperature and error history can be confi rmed with the remote controller.
1
Select "Service" from the Main menu, and press the
Select "Check" with the F1 or F2 button, and press the
Select "Request code" with the F1 or F2 button, and press the
2
Set the Refrigerant address and Request code.
Select the item to be changed with the F1 or F2 button.
Select the required setting with the F3 or F4 button.
■ <Ref.address>setting [ 0 ] – [ 15 ]
■ <Request code>setting
Press the
button, Data will be collected and displayed.
<Operation state> (Request code "0")
Data display
C
Operation mode
Relay output state
1) Operation mode
Display
Operation mode
0
STOP • FAN
C
COOL • DRY
H
HEAT
d
Defrost
OCH415F
2) Relay output state
4
Display
0
1
2
3
4
5
6
7
8
A
button.
button.
button.
Request code: 004
Discharge temperature: 69˚C
Power currently
Compressor Four-way valve Solenoid valve
supplied to compressor
ON
ON
116
Check menu
Error history
Refrigerant volume check
Refrigerant leak check
Smooth maintenance
Request code
Service menu:
Cursor
Request code
Ref.address
Request code
Request:
Cursor
Request code
Ref.address
Request code
Request:
Cursor
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents