6.2 Servicing

(1) Evacuation
Evacuation refers to the process of purging non-condensable gas, air, water, etc. from the
refrigerant equipment with a vacuum pump.
The R410A refrigerant is highly water insoluble, therefore even a little water left in the
refrigerant equipment will be frozen, which causes the so-called water blockage.
The refrigeration oil of the compressor is esterification oil or synoil which has strong
hygroscopicity, so deposit may be formed easily when foreign matters enter, which causes
many inexplicable faults.
● Evacuation procedure
(a) Check whether there is internal pressure in the machine. If there is any, use the inspection
connector to eliminate it.
(b) Connect the service hose of the collecting pipe gauge to the gas and liquid pipes.
(c) Connect the vacuum pump to the charge hose
following order.
Turn on the vacuum pump.
The combined pressure gauge displays -0.1MPa (-76cmHg).
When -0.1MPa (-76cmHg) is displayed, run the vacuum pump for over
15 min.
Close the low pressure valve ① of the collecting pipe gauge.
Turn off the vacuum pump.
Notes: (1) Never use the pressure of the refrigerant
to purge the air.
(2) Never use the compressor for
evacuation.
(3) Never operate the compressor in the
vacuum mode.
(2) Refrigerant charging
In case of leakage of R410A, be sure to discharge it all, evacuate the machine till the
acceptance value is reached, and charge new refrigerant according to the specified weight.
Never add refrigerant.
(a) Discharge all refrigerant from the machine and evacuate the machine.
Note: It is unreasonable to add refrigerant without evacuation, as this will cause insufficient
or
excessive
charging.
(b) Retain the collecting pipe gauge, and connect the refrigerant cylinder to the machine.
(c) Record the weight of the refrigerant cylinder on the scale. This is necessary to ensure the
amount of refrigerant to be charged.
(d) Purge the air in the charge hose
Loosen the connection between the charge hose
the valve ③ for several seconds; and tighten the connection immediately after the gas
blown from the loose part is observed.
(e) After the air is released from the charge hose
refrigerant gas will immediately flow from the cylindar into the machine. Ensure the
refrigerant cylindar is kept vertical to allow the gas to flow into the machine.
(f) The refrigerant will not move several procedures after it is charged into the system. In such
case, start the compressor to start the cooling cycle, till the machine is fully charged with
gas of the specified weight.
(g) After the amount of refrigerant is determined, close the valve ③.
(h) Remove the charge hose from the mahine. Cover the valve mouth of the refrigerant pipe
with the blanking cover and tighten it.
(i) Use the gas leak detector to check for any leakage along the piping.
(j) Start the air conditioner, and ensure that its operation, the high/low pressure and temperature
difference between inlet air and outlet air, etc. are normal.
. Conduct evacuation repeatedly in the
Inspection connector
Service hose
Charge hose
.
and the collecting pipe gauge; open
, open the valves ① and ③ and the
-60-
Liquid
Gas
Collecting pipe
gauge
Refrigerant
cylinder
Vacuum
pump