Back-Up Operation Of Boiler; Supplementary Information - Mitsubishi Electric EHST20C-VM2C.UK Service Manual

Cylinder unit
Table of Contents

Advertisement

12

SUPPLEMENTARY INFORMATION

Refrigerant collecting (pumpdown) for split model systems only
Refer to "Refrigerant collection" in the outdoor unit installation manual or service manual.

Back-up operation of boiler

Heating operation is backed up by boiler.
For more details, refer to the installation manual of PAC-TH011HT-E.
<Installation & System set up>
1. Set DIP-SW 1-1 to ON "With boiler" and SW2-6 to ON "With Mixing tank".
2. Install the thermistors THWB1 (Flow temp.) and THWB2 (Return temp.) *1 on the boiler circuit.
3. Connect the output wire (OUT10: Boiler operation) to the input (room thermostat input) on the boiler. *2
4. Install one of the following room temperature thermostats. *3
Wireless remote controller (option)
Room temp. thermostat (local supply)
Main controller (remote position)
*1 The boiler temperature thermistor is an optional part.
*2 OUT10 has no voltage across it.
*3 Boiler heating is controlled on/off by the Room temp. thermostat.
<Remote controller settings>
1. Go to Service menu > Heat source setting and choose "Boiler" or "Hybrid". *4
2. Go to Service menu > Operation settings > Boiler settings to make detailed settings for "Hybrid" above .
*4 The "Hybrid" automatically switches heat sources between Heat pump (and Electric heater) and boiler.
OCH570
84

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents