Unpacking; Serverboard Installation - Supero SUPERSERVER 7047R-3RF4+ User Manual

Hide thumbs Also See for SUPERSERVER 7047R-3RF4+:
Table of Contents

Advertisement

S
S
UPER
ERVER 7047R-3RF4+ User's Manual

Unpacking

The serverboard is shipped in antistatic packaging to avoid electrical static dis-
charge. When unpacking the board, make sure the person handling it is static
protected.
5-2

Serverboard Installation

This section explains the fi rst step of physically mounting the X9DR3-LN4F+ into
the SC745TQ-R920B chassis. Following the steps in the order given will eliminate
the most common problems encountered in such an installation. To remove the
serverboard, follow the procedure in reverse order.
Installing to the Chassis
1. Access the inside of the system by removing the screws from the lip of the
top cover of the chassis, then push the latch and pull the cover off.
2. Make sure that the I/O ports on the serverboard align properly with their
respective holes in the I/O shield at the back of the chassis.
3. Carefully mount the serverboard to the serverboard tray by aligning the board
holes with the raised metal standoffs that are visible in the chassis.
4. Insert screws into all the mounting holes on your serverboard that line up
with the standoffs and tighten until snug (if you screw them in too tight, you
might strip the threads). Metal screws provide an electrical contact to the
serverboard ground to provide a continuous ground for the system.
5. Replace the top cover of the chassis whenever work inside the chassis has
been completed.
Warning: To avoid damaging the motherboard and its components, do not apply
any force greater than 8 lbs. per square inch when installing a screw into a mount-
ing hole.
5-2

Advertisement

Table of Contents
loading

Table of Contents