8.
Installation details
8.1
Wrench torque sheet for installation
8.2
Connecting the cables
The power cord of connect should be selected according to the following specifications sheet.
8.3
Pipe length and the elevation
Pipe size
Capacity
Btu/h
GAS
3/8'' (φ9.52)
7k~12K
1/2'' (φ12.7)
1/2'' (φ12.7)
18K~28K
5/8'' (φ15.88)
5/8'' (φ15.88)
Caution:
Capacity is base on standard length and maximum allowance length is base of reliability.
Oil trap should be install per 5-7 meters.
14
Service manual
Outside diameter
mm
inch
φ6.35
1/4
φ9.52
3/8
φ12.7
1/2
5/8
φ15.88
3/4
φ19.05
Grade
Unit
7K
2
mm
1.0
LIQUID
1/4'' (φ6.35)
1/4'' (φ6.35)
1/4'' (φ6.35)
1/4'' (φ6.35)
3/8'' (φ9.52)
Torque
Kg.m
1.8
4.2
5.5
6.6
6.6
9K
12K
1.0
1.5
Standard
Max.
length
Elevation
(m)
B (m)
5
5
5
5
5
8
5
10
5
10
In case that
more than 5m.
Max.
Additional
Elevation
refrigerant
B (m)
(g/m)
10
30
10
30
15
30
20
30
20
65