Advertisement

MANUAL
RA/RM-2D
0402
822 70 90-04
CARAVAN
Deutsch
English
Français
Svenska
Español
Suomi
Italiano
RM 7501
Seite
page
page
sida
pagina 37
sivu
pagina 54
3
12
20
29
46

Advertisement

Table of Contents
loading

Summary of Contents for Dometic Caravan RM 7501

  • Page 1 MANUAL CARAVAN RA/RM-2D 0402 RM 7501 Deutsch Seite English page Français page Svenska sida Español pagina 37 Suomi sivu Italiano pagina 54 822 70 90-04...
  • Page 3: Table Of Contents

    OPERATING AND INSTALLATION INSTRUCTIONS FOR DOMETIC REFRIGERATORS INTRODUCTION CONTENTS We are pleased that you have chosen this refrigerator and hope you will derive much satisfaction from using it, OPERATING INSTRUCTIONS ......13 but first a few well-meant words of advice: CONTROLS ............
  • Page 4: Voltage

    6. Hold the button (C) an additional 10-15 seconds to OPERATING INSTRUCTIONS activate the flame failure device, then release it. CONTROLS If the lamp start flashing again, repeat step 4-6. To terminate gas operation, turn the knob (A) to “OFF” position.
  • Page 5: Defrosting

    DEFROSTING Note: The heating cable will draw 12 V (DC) power con- tinuously when in the ON (I) position. It should be turned Frost will gradually accumulate on the refrigerating sur- OFF (0) when a charging source is not available. faces.
  • Page 6: Maintenance

    The refrigerator must not be exposed to radiated heat Service and spare parts are obtainable from your dealer from hot objects. or Dometic - consult the telephone directory. Excessive heat irradiation impairs performance and leads to increased energy consumption. For this reason the...
  • Page 7: Ventilation Of The Unit

    L500 and one roof vent model R500, which sure. There must not be more than 3 mm of clearance are specially developed by Dometic for this purpose. between refrigerator and enclosure on each side. If nec- The L500-ventilation grilles permit inspection and small essary, wooden strips or similar should be fitted.
  • Page 8 VENTILATION OF THE UNIT Sealing gasket e.g. of V-type This piece is Cut out opening for the already on the roof vent R500 refrigerator is 507 x 87 mm. Condenser Cut out opening for the side vent L500 Condenser is 451 x 341 mm. L205: 451 x 156 mm.
  • Page 9: Lp Gas Connection

    LP GAS CONNECTION As the colours of the wires in the mains lead of this ap- pliance may not correspond with the coloured markings identifying the terminals in your plug, proceed as follows: The refrigerator is designed for operation on LP gas, the pressure of which must be 30 mbar for Propane.
  • Page 10: Technical Data

    12 V supply of reigniter and interior light TECHNICAL DATA The reigniter and the interior light must be connected to RM 7501 a separate 12 V battery. Overall dimensions, refrigerator Connect the battery to the terminal block (fig. 4 “Reigniter, Height (incl.
  • Page 11: Positioning Of Shelves

    Positionierung von Regale Positioning of shelves Hyllyjen säätö Installation des clayettes Posizionamento dei ripiani Omplacering av hyllor MO-FO 0324...

Table of Contents