Carrier 58MXA 170 Series Installation, Start-Up, And Operating Instructions Manual page 51

Deluxe 4–way multipoise fixed-capacity direct vent condensing gas furnace sizes 040-140, 170 series;
Table of Contents

Advertisement

LOAD CALCULATION
____________
Heating Load (Btuh)
____________
Cooling Load (Btuh)
____________
Furnace Model Selection
COMBUSTION AIR AND VENT PIPING
Termination Location
________
Roof or Sidewall
________
Termination Kit — 2 Pipe or Concentric
________
Combustion-Air Pipe Length
________
Combustion-Air Pipe Elbow Quantity
________
Vent Pipe Length
________
Vent Pipe Elbow Quantity
________
Pipe Diameter Determined from Sizing Table
________
Pipe Sloped To Furnace
Pipe Insulation
________
Over Ceilings
________
Low-Ambient Exposed Pipes
CHECKLIST—INSTALLATION
Condensate Drain
________
________
________
________
________
CHECKLIST—START-UP
________
________
Thermostat Anticipator
________
________
Safety Controls Check Operation
________
________
51
Unit Level or Pitched Forward
Internal Tubing Connections Free of Kinks
and Traps
External Drain Connection Leak Tight and
Sloped
Condensate Trap Primed before Start-Up
Heat Tape Installed if Required
Gas Input Rate
(Set Within 2 percent of Rating Plate)
Temperature Rise Adjusted
Anticipator Setting Adjusted or
Cycle Rate (3 Cycles per Hr) Selected
Primary Limit
Pressure Switch

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

58mxa

Table of Contents