Superior FS1RS-120V Installation And Operating Instructions Manual

Fast steamer

Advertisement

Quick Links

FAST
STEAMER
MODEL
FS1RS-120V
Installation and
Operation
Instructions
2M-Z11318 Rev. A 10/25/2011
FSRS


Advertisement

Table of Contents
loading

Summary of Contents for Superior FS1RS-120V

  • Page 1 FAST STEAMER MODEL FS1RS-120V Installation and Operation Instructions 2M-Z11318 Rev. A 10/25/2011 FSRS...
  • Page 2: Safety Symbol

    SAFETY SYMBOL These symbols are intended to alert the user to the presence of important operating and maintenance instructions in the manual accompanying the appliance. RETAIN THIS MANUAL FOR FUTURE REFERENCE NOTICE Using any part other than genuine Star factory supplied parts relieves the manufacturer of all liability.
  • Page 3: Electrical Specifications

    SPECIFICATIONS IL1425 ONT LOADING TOP LOADING FAST STEAMERS SPECIFICATIONS TOP LOADING Model "A" Width "B" Height "C" Depth Approx. Capacity (inches) Direct (D) Inches/CM Inches/CM Inches/CM Shp Weight W_x_D_x_H Reservoir (R) Pan Size FSRS 8.8in / 47.8cm 0.5in / 6.7cm 7.in / 4.7cm 48lbs / .8kg / ELECTRICAL SPECIFICATIONS Top Loading Certification Model No.
  • Page 4: General Information

    GENERAL INFORMATION CAUTION T his equipment is designed and sold for commercial use only by personnel trained and experienced in its operation and is not sold for consumer use in and around the home nor for use directly by the general public in food service locations. B efore using your new equipment read and understand all the instructions & labels associated with the unit prior to putting it into operation. Make sure all people associated with its use understand the units operation & safety before they use the unit. A ll shipping containers should be checked for freight damage both visible and concealed. This unit has been tested and carefully packaged to insure delivery of your unit in perfect condition. If equipment is received in damaged condition, either apparent or concealed, a claim must be made with the delivering carrier. C oncealed damage or loss - if damage or loss is not apparent until after equipment is unpacked, a request for inspection of concealed damage must be made with carrier within 5 days. Be certain to retain all contents plus external and internal packaging materials for inspection. The carrier will make an inspection and will supply necessary claim forms. These models are equipped for the voltage and wattage indicated on the nameplate. These units are designed to operate on alternating current (A.C.), two wire single phase service only and are equipped with an approved lead in cord set with a three prong grounding type plug. DO NOT CONNECT TO DIRECT CURRENT (D.C.). UNPACKING Carefully remove the steamer from the shipping and packing & protective material. Remove all removable parts and clean with hot water and mild detergent. Wipe the unit using damp cloth. Never hose down the unit with water, this steamer has Unit should also contain: • Operations manual & Authorized Service Agent Listing Packet Purchasers Responsibility • To see that the electric services for the unit are installed on site in accordance with the manufacturer's specifications and municipal codes.
  • Page 5: Installation

    PLATE OF THE UNIT. WATER SUPPLY These units come equipped with a  cup water tank with tank drain and supply pump. It is vital that all water supply lines be thoroughly flushed with clean water before being connected to the steamer. The Superior Fast-Steamer has a water injection system, to ensure your new equipment works at its premium, we recommend that a water softener is used in areas where hard water is present. Contact your local water equipment system provider to assist you in determining your specific water quality, or contact Superior Technical support for assistance, -800-807-9054. Reservoir Water Units 1.
  • Page 6: Operating Procedure

    OPERATING PROCEDURE Connect your unit to a wall outlet which will supply the unit with the proper voltage specified on the data plate. If you have a reservoir unit, verify the water level, add if water is low. CAUTION KEEP HANDS AND FACE AWAY FROM THE UNIT WHEN OPENING OR REMOVING THE SPATULA FROM THE UNIT. STEAM ESCAPING IS VERY HOT. MANUAL CONTROL • Turn unit on Wait 20 - 30 minutes for the unit to reach its operating temperature before using.
  • Page 7 4. Reinstall the unit, beginning with the Steam Vent. Monthly The Superior Fast Steamer generates instant steam by means of its open generator, however the mineral deposits in the water are left behind. A certain amount of deposits are needed for proper operation, but a build-up of calcium & mineral deposits may cause poor performance. It is important to properly maintain you steamer to ensure quality operation. Depending on your specific water conditions and possibly any water filtration systems, you may need to clean your steamer more or less frequently.
  • Page 8 CLEANING continued Excessive Mineral Build-up 4. Use a delimer solution, which is safe for cast aluminum, on the steam generator surface. Follow the instruction provide with the delimer solution. 5. Use a dry towel or sponge to remove the delimer solution, then rinse with clean water. 6. Install the diffuser, generator cover secure with the wing nut as shown here. 6. Plug the steamer power cord into the power supply, and turn unit on. 7. Allow unit to reach operating temperature. CAUTION KEEP HANDS AND FACE AWAY FROM THE UNIT WHEN OPERATING THE UNIT. STEAM ESCAPING IS VERY HOT. 8. Push the Green "Steam Shot" button several times to operate the steamer. This removes any delimer solution from the generator surface.
  • Page 9 Visit our Website at: www.star-mfg.com Email: service@star-mfg.com THOROUGHLY INSPECT YOUR UNIT ON ARRIVAL This unit has been tested for proper operation before leaving our plant to insure delivery of your unit in perfect condition. However, there are instances in which the unit may be damaged in transit. In the event you discover any type of damage to your product upon receipt, you must immediately contact the transportation company who delivered the item to you and initiate your claim with same.
  • Page 11 MODEL FS1RS Main Body Assembly SK2340 Rev. A 10/25/11...
  • Page 12: Parts List

    MODEL FSRS-0V Fast Steamer Main Body Number Part Description and Model Designation Number Number Unit C-406 SCREW 0-4X/ SS THP FSRS-0V C9-FS0364 COVER SKIN ASSY FS1RS-120V C-Z998 SCREW /8-6X PHFHMS SS FSRS-0V 2A-Z9955 HANDLE MOUNTING BLOCK FS1RS-120V 2R-09-WB-0027 HANDLE-BLK 3/8-16X1 PHFHMS SS FS1RS-120V C-904 SCREW 0-4X.75 FH SS FSRS-0V C9-FS0316 INSIDE COVER INSERT FS1...
  • Page 13 10 19 MODEL Fast Steamer Control Box Assemblies Reservoir Water Supply SK2341 Rev. - 12/20/07...
  • Page 14 C9-FS0343 CB BTM ASSY FS1/2 R MAN FS1RS-120V C9-FS0311 CNTR BOX BACK ASSY FS1RS-120V 2E-Z1858 SWITCH-LIGHTED FS1RS-120V 2M-Z11307 LABEL, OVERLAY SUPERIOR FS1RS-120V C9-Z10484 CNTR PANEL ASSY M/C FS1RS-120V 2E-Z9991 SNAP PUSHBUTTON ASSY FS1RS-120V C9-Z10486 TANK LID FSF FS1/2 STMR FS1RS-120V A-59 CAP & CHAIN...
  • Page 15 MODEL FS1 Hinge Bracket Assembly SK2342 Rev. - 12/20/07...
  • Page 16 PARTS LIST October 5, 0, Rev A FS1R, FS1D, FS1RT, FS1DT, FS2R, FS2D, FS2RT, FS2DT MODEL Top Loading Fast Steamer Hinge Assemblies Number Part Description and Model Designation Number Number Unit A-Z0454 CENTER HINGE PIN FS A-Z04 PIN, SPRING STEAMER C9-Z056 HINGE/COVER BRACKET C-Z05 COTTER PIN 8-8 5/6 .059 2A-Z9992 HINGE PIN, OUTSIDE C-Z406 SCREW 0-4X/ SS THP P-Z07 FS FS HINGE SPRING 2A-Z10093 SCREW SHOULDER 8-32X3/16 C9-Z045 COVER STOP FS FS...

Table of Contents