Baxi Platinum Combi 24 HE A Installation & Servicing Instructions Manual page 18

Platinum combi he a series gas fired wall mounted condensing combination boiler
Table of Contents

Advertisement

iii) Termination to a drain or gully
Boiler
iv) Termination to a purpose made soakaway
Further specific requirements for soakaway
design are referred to in BS 6798.
Boiler
Sink
Boiler
Condensate Pump
18
© Baxi Heating UK Ltd 2014
Pipe must terminate above
water level but below
surrounding surface. Cut
end at 45°
500mm min
Holes in the soak-away must
face away from the building
v) pumped into an internal discharge branch
(e.g. sink waste) downstream of the trap
Pipe must terminate above
water level but below
surrounding surface. Cut
end at 45°
Basement or similar
(heated)
vi) pumped into an external soil & vent pipe
Unheated Location
(e.g. Garage)
Boiler
7.0 Site Requirements
7.7
11. When discharging condensate into a soil stack or waste pipe
the effects of existing plumbing must be considered. If soil pipes
or waste pipes are subjected to internal pressure fluctuations
when WC's are flushed or sinks emptied then back-pressure
may force water out of the boiler trap and cause appliance
lockout.
12. A boiler discharge pump is available, 'MULTIFIT'
part no. 720648301. This pump will dispose of both condensate
& high temperature water from the relief valve. It has a
maximum head of 5 metres. Follow the instructions supplied
with the pump.
13. Condensate Drain Pipe 'Trace Heating' Elements are
available in various lengths. 'MULTIFIT' part nos.:-
1 metre 720644401
2 metre 720664101
3 metre 720664201
5 metre 720664401*
*Where the drain is between 3 & 5 metres a 5 metre kit can be
used and "doubled back" upon itself.
14. It is possible to fit the element externally on the condensate
drain or internally as detailed in the instructions provided.
15. The fitting of a 'Trace Heating' Element is NOT a substitute
for correct installation of the condensate drain. ALL
requirements in this section must still be adhered to.
Boiler
Basement or similar
(heated)
Pipe must terminate above
water level but below
surrounding surface. Cut
end at 45°
Condensate Pump
Condensate Drain (cont.)
vii) to a drain or gully with extended
external run & trace heating
The 'Trace Heating' element
must be installed in accordance
with the instructions supplied.
External runs & those in
unheated locations still require
insulation.