Weil-McLain Gold GV Series 4 User's Information Manual page 9

Gold gv water boiler — series 4
Hide thumbs Also See for Gold GV Series 4:
Table of Contents

Advertisement

GOLD GV Series 4 — User
GOLD GV Series 4 —
GOLD GV Series 4 —
GOLD GV Series 4 —
GOLD GV Series 4 —
EVERY
6 MONTHS
END
OF SEASON
Part number 550-141-866/1202
User's 's 's 's 's Information Manual
User
User
User
Information Manual
Information Manual
Information Manual
Information Manual
User maintenance procedures
Oil blower motor
1. Remove the jacket top panel to access the blower
motor.
2. Use only S.A.E. 20 motor oil. DO NOT use household
universal oils.
Use only S.A.E. 20 motor oil to
lubricate the blower motor. Do not
use common universal household oils.
3. See Figure 2.
4. Place a few drops of oil in each of the two oiler cups
on the side of the blower motor.
Operate boiler relief valve
1. Before proceeding, verify that the relief valve outlet has been piped to a safe place of discharge,
avoiding any possibility of scalding from hot water.
To avoid water damage or scalding due to valve operation, a metal discharge
line must be connected to relief valve outlet and run to a safe place of disposal.
This discharge line must be installed by a qualifed heating installer or service
technician in accordance with the instructions in the
The discharge line must be terminated so as to eliminate possibility of severe
burns should the valve discharge.
2. Read the boiler pressure/temperature gauge to make sure the system is pressurized.
3. Lift the relief valve top lever slightly, allowing water to relieve through the valve and discharge
piping.
4. If water flows freely, release the lever and allow the valve to seat. Watch the end of the relief
valve discharge pipe to ensure that the valve does not weep after the line has had time to drain.
If the valve weeps, lift the seat again to attempt to clean the valve seat. If the valve continues to
weep afterwards, contact your qualified service technician to inspect the valve and system.
5. If water does not flow from the valve when you lift the lever completely, the valve or discharge
line may be blocked. Immediately shutdown the boiler, following the lighting instructions on
the inside jacket top. Call your qualified service technician to inspect the boiler and system.
Follow boiler shutdown procedure
1. Follow "
TO TURN OFF GAS TO APPLIANCE
of the jacket top panel. You will also find these instructions on page 12 of this manual.
2. Do not drain system unless exposure to freezing temperatures will occur.
3. Do not drain the system if it is filled with an antifreeze solution.
4. Do not shut down boilers used for domestic water heating. They must operate year-round.
Figure 2 Blower motor
GV Boiler Manual
" on the
Lighting instruction
(cont.)
.
on the inside
9

Advertisement

Table of Contents
loading

Table of Contents