Diagnosis; Power On Sequence - Pioneer BDP-95FD Service Manual

Hide thumbs Also See for BDP-95FD:
Table of Contents

Advertisement

1

5. DIAGNOSIS

QQ

5.1 POWER ON SEQUENCE

3 7 63 1515 0
A
Power On Sequence
1 Pressing of the POWER key is detected by the IC3601 Submicrocomputer on the MAIN Assy.
The IC3601 then outputs a POWER_ON signal to the SYPS Assy.
2 After receiving the POWER_ON signal, the SYPS Assy activates, secondary
Power, setting it to ON.
B
3 The SMP8634 (IC1001), the core LSI, starts up.
4 Communication between the SMP8634 and the DDR SDRAM starts.
C
5 Communication between the SMP8634 and the FLASH_IC starts.
TE
L 13942296513
It takes about 1 minute to complete the startup process.
D
Troubleshooting
1 Are the pins at CN6051 and CN6002 supplied with voltages?
E
2 Is the reset signal H? (R1088)
3 Is the 27 MHz CLK oscillating? (X1001)
www
F
24
1
http://www.xiaoyu163.com
2
x
ao
y
.
i
2
http://www.xiaoyu163.com
3
8
Q Q
3
6 7
u163
BDP-95FD
3
4
2 9
9 4
1 3
1 5
0 5
8
2 9
m
co
.
4
2 8
9 9
9 4
2 8
9 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents