Horizontal Attic Installation; Construct A Working Platform; Install Furnace; Horizontal Crawlspace Installation - Bryant 373LAV Installation, Start-Up, And Operating Instructions Manual

Downflow/horizontal gas-fired induced-combustion furnaces series e
Table of Contents

Advertisement

FURNACE
(OR COIL CASING
WHEN USED)
DOWNFLOW
SUBBASE
SHEET METAL
PLENUM
Fig. 6—Furnace, Plenum, and Subbase Installed on a
Combustible Floor
IV. HORIZONTAL ATTIC INSTALLATION
WARNING: Do not install the furnace on its back;
safety control operation will be adversely affected. Never
connect return-air ducts to the sides or back of the
furnace. Failure to follow this warning could result in fire,
personal injury, or death.
The furnace can be installed horizontally on either the left-hand
(LH) or right-hand (RH) side. A typical attic installation is shown
in Fig. 7.
LINE CONTACT ONLY PERMISSIBLE BETWEEN
LINES FORMED BY INTERSECTIONS OF
THE TOP AND TWO SIDES OF THE FURNACE
JACKET AND BUILDING JOISTS,
STUDS, OR FRAMING.
SEDIMENT TRAP
A. Construct a Working Platform
Construct working platform on location where all required furnace
clearances are met. (See Table 1 and Fig. 7.)
B. Install Furnace
1. Position furnace in desired location.
2. Connect gas supply pipe. See Fig. 7 for typical piping entry.
3. Install field-supplied filter retainers as indicated in Fig. 8
4. Connect supply- and return-air ducts.
5. Install 24- X 24-in. sheet metal shield on platform in front
V. HORIZONTAL CRAWLSPACE INSTALLATION
The furnace can be installed horizontally with either the LH or RH
side up. In a crawlspace, the furnace can either be hung from the
floor joist or installed on suitable blocks or pad. The furnace can
be suspended from each corner by hanger bolts (4 each 3/8-in.
all-thread rod) cut to desired length, 1- X 3/8-in. flat washer,
3/8-in. lockwasher, and 3/8-in. nut. Dimples are provided for hole
locations. (See Fig. 1.)
Since horizontal crawlspace installation is very similar to the attic
installation, refer to section IV. The installation of a sheet metal
shield in front of the louvered control panel is covered in section
IV. For a crawlspace installation, this same sheet metal shield must
be installed above the louvered control panel. Extend the sheet
A78651
metal shield over the furnace top far enough to cover the gas pipe
entry hole.
VI. FILTER ARRANGEMENT
WARNING: Never operate unit without a filter or with
filter access door removed. Failure to follow this warning
could result in fire, personal injury, or death.
The 2 factory-supplied filters are shipped in the blower compart-
ment. After the return-air duct has been connected to the furnace,
install the filters in a V-formation inside the return-air plenum. See
Fig. 8 and Table 4 for horizontal applications. Horizontal filter
retainers must be field supplied. See Fig. 9 for downflow applica-
tions.
GAS
ENTRY
24"
SHEET
METAL
24"
Fig. 7—Typical Attic Installation
—6—
and Table 4 before connecting return-air duct to furnace.
of louvered control panel as shown in Fig. 7.
FLUE VENT
I N
6 " M
30-IN. MIN
WORK AREA
A82178

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents