Mobile Home Installations - USSC Ashley AP5660 Installation And Operating Manual

Pellet fuel-burning room heater
Table of Contents

Advertisement

Mobile home installation should be done in accordance with the Manufactured Home and Safety Standard (HUD), CFR 3280,
Part 24. Canadian installations require that the heater must be connected to a 3 or 4 inch, factory-built chimney conforming to
CAN/ULC-S629. See the installation illustrations in this manual for minimum height above the roof. U.S. Stove suggests the use
of Selkirk's Pellet Venting Products. Refer to their installation instructions for proper installation of the exhaust and combustion
air intake. The chimney installation must allow for removal in case of mobile home transportation, especially outside connec-
tions. You may contact your local building authority or person having jurisdiction on height restrictions.
In order for this unit to be installed in a mobile home the following criteria must be met:
The unit must be secured to the fl oor using lag bolts in the holes provided in the pedestal base.
Ensure that the unit is permanently electrically grounded to the chassis of your home.
IT IS MANDATORY TO TAKE THE COMBUSTION AIR FROM THE OUTSIDE WHEN INSTALLING THIS UNIT IN AIR
TIGHT OR MANUFACTURED/MOBILE HOMES.
CAUTION: THE STRUCTURAL INTEGRITY OF THE MANUFACTURED HOME FLOOR, WALL, AND CEILING/ROOF
MUST BE MAINTAINED. MAKE SURE TO MAINTAIN AN EFFECTIVE VAPOR BARRIER BY SEALING WITH SILICONE
WHERE THE CHIMNEY OR OTHER COMPONENTS PENETRATE TO THE EXTERIOR OF THE STRUCTURE. REFER
TO AND FOLLOW THE CHIMNEY MANUFACTURER'S INSTALLATION INSTRUCTIONS.
WARNING: DO NOT INSTALL IN SLEEPING ROOM.
STEEL FRAME
NOTE: Only the freestanding model is approved for installation into a mobile home.
MOBILE HOME INSTALLATION
1/4" LAG BOLTS,
SECURELY FASTENED
GROUND WIRE, DIRECTLY
TO METAL CHASSIS
19
Figure 15
HEARTH PAD
FLOORING

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ashley ap5660pe

Table of Contents