Installation Checklist; Pack Contents - Raymarine p70 Installation And Operation Instructions Manual

Table of Contents

Advertisement

3.1 Installation checklist

Installation includes the following activities:
Installation Task
1
Plan your system.
2
Obtain all required equipment and tools.
3
Site all equipment.
4
Route all cables.
5
Drill cable and mounting holes.
6
Make all connections into equipment.
7
Secure all equipment in place.
8
Power on and test the system.
Schematic diagram
A schematic diagram is an essential part of planning any
installation. It is also useful for any future additions or
maintenance of the system. The diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
14

3.2 Pack contents

All models contain the following items:
1
3
6
5
8
Number
Description
1.
p70 / p70R Pilot controller (p70 8 button controller is
shown in diagram above.)
2.
Bezel
3.
Gasket
4.
Suncover
5.
4 x fixing screws
6.
Document pack
7.
SeaTalk
ng
Blanking plug
8.
SeaTalk
ng
Spur Cable
Unpack the pilot controller unit carefully to prevent damage.
Save the carton and packing in case the unit has to be returned
for service.
2
4
7
D12098-1
p70 / p70R

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P70rE22166E22167

Table of Contents