Amana GUIS Installation Instructions Manual page 10

Two-stage gas-fired warm air furnace
Table of Contents

Advertisement

A ground joint union, drip leg, and manual shutoff valve
must also be supplied by the installer. In some cases, the
installer may also need to supply a transition piece from 1/2"
to another pipe size.
Figure 10
Gas Inlet Through Furnace Bottom Side
(Upflow)
When the gas piping enters through the left side of the
furnace, the installer must supply the following fittings
(starting from the gas valve):
Straight pipe to reach the exterior of the furnace. See
Figures 11 & 12.
A ground joint union, drip leg, and manual shutoff valve
must also be supplied by the installer. In some cases,
the installer may also need to supply a transition piece
from 1/2" to another pipe size.
Figure 11
Gas Inlet Through Furnace Left Side
(Upflow)
Gas Inlet Through Furnace Top Side
The gas piping connections shown in Figures 10 and 12 are
for a furnace equipped for a right hand discharge (Figure
13). Adaptation for left hand discharge should be self
explanatory.
Horizontal Furnace (Right Hand Discharge)
Counterflow Installations
When the gas piping enters through the left side of the
furnace, the installer must supply a straight pipe to reach
the exterior of the furnace (Figure 14).
Gas Inlet Through Left Side
(Counterflow)
A ground joint union, drip leg, and manual shutoff valve
must also be supplied by the installer. In some cases, the
installer may also need to supply a transition piece from 1/2"
to another pipe size.
10
Figure 12
(Upflow)
Figure 13
Figure 14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gcis

Table of Contents