User Notices; Electrical Requirements; Initial Set Up; Operating Controls - Bunn G9 HD Operating & Service Manual

Coffee brewer
Table of Contents

Advertisement

USER NOTICES

Carefully read and follow all notices on the grinder and in this manual. They were written for your protection.
All notices on the grinder are to be kept in good condition. Replace any unreadable or damaged labels.
#05876.0000

ELECTRICAL REQUIREMENTS

This grinder has an attached cordset and requires 2-wire, grounded service rated 120 volts ac, 15 amp,
single phase, 60 Hz or 2 wire, grounded service rated 220-240 volts ac, 4.7 amp, single phase, 50 Hz.

INITIAL SET UP

1. Open the top lid. Clear all foreign objects and shipping materials from the hopper compartment and the
entrance to the grind chamber.
2. Fill hopper compartment with whole bean coffee. (Capacity 9 pounds). The grinder is now ready for use.

OPERATING CONTROLS

Off/On/Start Switch
OFF - (left position)
Placing the switch in this position stops the operation of the grinder.
ON - (center, resting position)
The switch will return to this position after a grind cycle has begun and
will remain in this position after grinding has ceased.
START - (right, momentary position)
Placing the switch in this position initiates a timed grind cycle.
Batch Selector Switch (Optional)
URN - Switching to this position allows the correct amount of beans to be dispensed when grinding a
large batch.
CARAFE - Switching to this position allows the correct amount of beans to be dispensed when grinding
a small batch.
#20545.0000
3
P1300
10171 121597

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G9t hd

Table of Contents