Replacement
4.30 Navigation Key PBA
Follow the 3.1 – 3.2 & 3.6 – 3.9 Disassembly instructions!
Carry out the installation as described below.
Follow the 5.2 – 5.5 & 5.9 - 5.10 Reassembly instructions!
INSTALLATION
Use these two holes as alignment for the corresponding
holes of the Dome Sheet during installation.
Attach the Dome Sheet and verify that the two holes are
properly aligned with the holes of the Navigation Key PBA
as described above and that the eight LEDs can emit light
through the holes of the Dome Sheet (as indicated by the
blue circles).
1225-1010 Rev 1
©
Sony Ericsson Mobile Communications AB – Company Internal
Working Instructions (mech)
52(70)