Navien NCB-180 Installation & Operation Manual page 29

Combination boiler
Hide thumbs Also See for NCB-180:
Table of Contents

Advertisement

3.6.2 System Application - Zone System with Zone Valves
Zone #1
Zone Valve
System Circulator
(Typical)
Air Separator
Expansion Tank
28
Installing the System Piping
Additional Zone
Zone #2
Not to exceed 4 pipe Dia or Max. 12"
System application drawings are intended
Note
to explain the system piping concept only.
Refer to 3.4 System Fill Connection on
page 25 for make-up fill connections
and refer to the requirements of your local
codes to ensure compliance.
Wiring Diagram
CN23
CN10
Zone1 T/S
Zone2 T/S
Zone3 T/S
Zone4 T/S
<Zone Controller>
Zone1 Pump
Zone2 Pump
Zone3 Pump
Zone4 Pump
<NCB>
CN24
CN25
Common
Hot
Zone5 T/S
Zone6 T/S
Zone5 Pump
Zone6 Pump
T/T

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ncb-210Ncb-240

Table of Contents