Dell E153FPc Service Manual page 24

15” lcd monitor
Hide thumbs Also See for E153FPc:
Table of Contents

Advertisement

www.ma163.com
Black Adhesive Tape
Mylar
Main board
B
A
C
Ground
D
u5[Pb€ g /• D e™ • Q
Power board
Ground
24
When installing monitor. Fix the LVDS by
Black Adhesive Tape. 10mm should be
kept between the tape and the connect
end.
Remove the Power board and main
board:
Remove the eight screws by
And take off the Power board and main
board.
Installing the LVDS cable:
Connect the LVDS cable with MB, and
then fix the cable by screwing the cable
hook, and the ground end to the
mainframe.
Make sure the ground line is
below signal lines.
Line C is power supply for the MB.
Connect the PB and MB directly; the
cable must not touch the pillar of screw.
Dell E153FPc
Torque B

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents