Table Of Contents; Step 1: Unpacking; Step 2: Cabinet Preparation - Thermador C272 Installation Instructions Manual

Built-in electric oven
Hide thumbs Also See for C272:

Advertisement

STEP 1: UNPACKING ............................................................................................ 2
STEP 2: CABINET PREPARATION ..................................................................... 2
STEP 3: ELECTRICAL INSTALLATION ............................................................. 6
STEP 4: INSTALLING THE OVEN ...................................................................... 7
STEP 5: INSTALLING THE BOTTOM TRIM .................................................... 8

STEP 1: UNPACKING

Cut the bands from the carton. Carefully remove the
carton, fillers and all packing material. Included with
your new Thermador oven are the following:
Number of Racks Per Oven Model
C272 / C302 / CM302
SCD272 / SCD302
SC272 / SC302
CJ302
SC301 / C271 / C301 / CM301 / SMW272 / SM272
CJ301
One 2-Piece Broiler Pan (Excluding CJ 301)
Care & Use Manual
Installation Instructions
Bottom Trim
Installation Screws (Packet)
Quick Guide
Cookbook (C, CJ and CM models only)

STEP 2: CABINET PREPARATION

The cabinet cutout dimensions for wall mounted and
under the counter installations are shown in Figs. 2 and
3, respectively.
It is good practice, when oven is installed at the end of
a cabinet run, adjacent to a perpendicular wall or cabinet
door, to allow at least 1/4" space between the side of the
oven door and the wall/door.
Wall Mounted Units -
For oven support, install 2 x 4's extending front to back
flush with the bottom and the side of the opening.
The supporting base must be well secured to the floor/
cabinet and level with the floor line.
WARNING
To prevent potentially hazardous grease collection
from spills, the back of the base for CJ Ovens must not
be below the level of the front.

TABLE OF CONTENTS

Fig. 1 Oven Base Attachment
6
6
5
4
3
1
Shipping base skid
The bottom trim is shipped, wrapped in waxed paper, on
top of the unit and should not be unpacked until the final
step when the oven has been placed in the cabinet. See
Fig. 6.
NOTE: The conduit box for double ovens (SC272,
SCD272, SC302, SCD302, C272, C302, CM302, CJ302,
SMW272 and SM272) should be located above the unit
to facilitate connecting and servicing. For single ovens
(SC301, C271, C301, CJ301 and CM301) the conduit
box may be installed either above or below the unit. If
the conduit box is installed below the unit, a 2" diameter
hole or space is required between the back wall and the
right rear of the 2 x 4 supports. See Figure 2.
When an oven is installed, the cabinet base must be
capable of supporting the oven weight as listed below:
Oven
S-series Single Oven
C-series Single Oven
CM Single Oven
S-series Double Oven
C-series Double Oven
CM/CJ Double Oven
CJ Single Oven
Page 2
Remove Screws -
4 places
Pounds Kilograms
165
75
210
95
240
109
330
150
355
161
370
168
280
127