Carrier 58MVB Installation, Start-Up, And Operating Instructions Manual page 57

4-way multipoise variable-capacity condensing gas furnace for sizes 040—120, series 100
Hide thumbs Also See for 58MVB:
Table of Contents

Advertisement

5. Turn off 115-v power to furnace.
6. Reconnect inducer motor wire harness. Reinstall furnace
access door.
7. Turn on 115-v power to furnace.
8. Reset thermostat to desired temperature.
1. Put away tools and instruments. Clean up debris.
2. Verify flame rollout manual reset switch has continuity.
3. Verify that blower and main access doors are properly
installed.
4. Cycle test furnace with room thermostat.
5. Check operation of accessories per manufacturer's instruc-
tions.
6. Review User's Manual with owner.
7. Leave literature packet near furnace.
57
CHECKLIST

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents