LOAD CALCULATION
____________
Heating Load (Btuh)
____________
Cooling Load (Btuh)
____________
Furnace Model Selection
VENT PIPING
Termination Location
________
Roof or Sidewall
________
Vent Pipe Length
________
Vent Pipe Elbow Quantity
________
Pipe Diameter Determined from Sizing Table
________
Pipe Sloped To Furnace
Pipe Insulation
________
Over Ceilings
________
Low-Ambient Exposed Pipes
Copyright 2005 CARRIER Corp. • 7310 W. Morris St. • Indianapolis, IN 46231
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
PC 101
Tab 6a 8a
CHECKLIST—NON DIRECT VENT (1-PIPE) INSTALLATION
Printed in U.S.A.
Catalog No. 58MTB-1SI
Condensate Drain
________
Unit Level or Pitched Forward
Internal Tubing Connections Free of Kinks
________
and Traps
External Drain Connection Leak Tight and
________
Sloped
________
Condensate Trap Primed before Start-Up
________
Heat Tape Installed if Required
CHECKLIST—START-UP
Gas Input Rate (Set Within 2 percent of
________
Rating Plate)
________
Temperature Rise Adjusted
Thermostat Anticipator
________
Anticipator Setting Adjusted or
________
Cycle Rate (3 Cycles per Hr) Selected
Safety Controls Check Operation
________
Primary Limit
________
Pressure Switch
Pg 60
58mtb1si
8-05
Replaces: 58MTA-8SI