Haier HFU-09HA03/R2(DB) Operation Manual page 20

Floor unit
Hide thumbs Also See for HFU-09HA03/R2(DB):
Table of Contents

Advertisement

Operation
EMERGENCY OPERATION AND TEST OPERATION
EMERGENCY OPERATION
Carry out this operation only when the remote
controller is defective or lost.
Unit start
When the emergency operation switch is
pressed, a sound you can hear, which
means the start of this operation.
Follow the requirements below.
Room
Designated
temperature
temperature
o
o
>23
C
26
C
o
o
23
C
23
C
*
Unit stop (to cancel emergency operation)
Press the emergency switch and hear a sound, the unit stops.
TEST OPERATION
Use this switch in the test operation when the room
temperature is less 16
operation.
Unit start
Continue to press the test operation switch
for more than 5 seconds. After you hear the
"BI" sound twice, release your finger from
the switch, the test operation starts and the
air conditioner starts with the air flow speed
setting "Hi".
Unit stop(to cancel test operation)
Push the test run switch or operate with remote controller to cancel the test run.
If you use the remote controller to cancel the test run, the conditioner will then run as
per the working mode displayed on the remote controller.
Air flow
Timer
Operation
speed
mode
mode
None
AUTO
COOL
None
AUTO
HEAT
o
C, do not it in the normal
19
POWER
ON/OFF
EMERGENCY SWITCH
Anion
None
None
POWER
ON/OFF
TEST SWITCH
TIMER
RUN
TIMER
RUN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hfu-18ha03/r2(db)Hfu-12ha03/r2(db)

Table of Contents