6. Test running

1) Connection of power supply
1. Connect the power supply cord to independent
power supply.
2. Prepare the remote control.
• Insert two batteries provided.
Remove the cover from the back of the remote con-
trol.
• Slide the cover according to the arrow directon.
• Insert the two batteries.
(Two "R03" or "AAA" dry-cell batteries or equiva-
lent).
• Be sure that the (+) and (-) directions are correct.
• Be sure that both batteries are new.
Re-attach the cover.
• Slide it back into position.
3. Operate the unit at cooling operation mode for
fitteen minutes or more.
Settlement of Outdoor Unit
• Anchor the outdoor unit with a bolt and nut (ø10cm)
tightly and horizontally on a concrete or rigid mount.
• When installing on the wall, roof or rooftop, anchor
the mounting base securely with a nail or wire
assuming the influence of wind and earthquake.
• In the case when the vibration of the unit is con-
veyed to the house, settle the unit with an anti-
vibration rubber.
2) Evaluation of the performance
1. Measure the temperature of the intake and dis-
charge air.
2. Ensure the difference between the intake tem-
perature and the discharge one is more than
8°C.
discharge air
ƒ¡ 40ƒ¡
Tubing connection