Adjustment Instructions; Adjustment Instructions - Zenith Z50PX2D Series Service Manual

Af-05fd chassis
Table of Contents

Advertisement

1. Application Object
These instructions are applied to all of the PDP TV, AF-05FD.
2. Notes
(1) Because this is not a hot chassis, it is not necessary to use
an isolation transformer. However, the use of isolation
transformer will help protect test equipment.
(2) Adjustments must be done in the correct order.
(3) The adjustments must be performed in the conditions of
25±5°C of temperature and 65±10% of relative humidity if
there is no specific designation.
(4) The input voltage of the receiver be must kept 110V, 60Hz
during adjustment.
(5) The receiver must be operational for about 15 minutes
prior to the adjustments.
1) After receiving 100% white pattern, the receiver must be
operated 15 minutes prior to adjustment. (Or 8. White
Pattern condition in EZ - Adjust)
2) Enter into White Pattern
- Pressing POWER ON Key on Service Remote Control
(S R/C)
- Enter the Ez - Adjust by pressing ADJ Key on Service
Remote Control (S R/C).
- Select the 8. White Pattern using CH +/- Key and
press the
Enter(Y) Key.
Display the 100% Full White Pattern.
[ The set will display white screen without a signal
generator in this mode.
If you turn on a still screen more than 20 minutes (Especially
Digital pattern, Cross Hatch Pattern), an afterimage may occur
in the black level part of the screen.
3. EPLD Download
PC
<Fig 1> Connection Diagram of EPLD Download
(1) Test Equipment: PC, Jig for download
(2) Connect the power of VSC B/D.
(3) Execute download program(iMPACK) of PC.
(4) After executing the hot key on the Programmer, click icon
(5) End after confirming

ADJUSTMENT INSTRUCTIONS

VSC
B/D
Each PCB Assy must be checked by Check JIG Set before
assembly. (Especially, be careful Power PCB Assy which can
cause Damage to the PDP Module.)
4. POWER PCB Assy Voltage
Adjustment
4-1. Test Equipment :
4-2. Connection Diagram for Measuring
Refer to Fig. 2.
<Fig. 2> Connection Diagram of Power Adjustment for the
Measuring (Power Board)
4-3. Adjustment
(1) Va Adjustment
1) Connect + terminal of D.M.M to Va pin of P805 and
connect – terminal to GND pin of P805.
2) Adjust RV601 voltage to match that of the label on the
Top/Right of the panel. (Deviation : ±0.5V)
(2) Vs Adjustment
1) Connect + terminal of D.M.M to Vs pin of P805 and
connect – terminal to GND pin of P805.
2) Adjust RV401 voltage to match that of the label on the
Top/Right of the panel. (Deviation : ±0.5V)
- 9 -
(Va, Vs Voltage Adjustment)
D.M.M 1EA

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents