(3) LVD ST Data Transfer
Figure 1.22 is the LVD ST Data Transfer measurement point.
** Use the crossing that yield the shorter Assertion Period
and Negation Period.
Figure 1.22 LVD ST Data Transfer measurement point
Notes:
1. V
- negated signal
N
2. V
- asserted signal
A
3. t
= 1.25ns minimum
m
4. V
or V
are required to drive the 100 mV at the leading edge of the transition. Those signals shall be at
A
N
least |100 mV| for at least t
5. Differential voltage signals in all cases.
6. t
and t
shall be less than 3 ns.
af
ar
7. Any signal structure may occur at the receiver while in the t
56
*
*
before and after the transition.
m
**
**
or t
region including slope reversal.
af
ar
C141-C015