Download Print this page

American Standard Green Tea Deck-Mount Bath Filler 7010.900 Installation Instructions page 3

Deck-mount bath filler

Advertisement

6
HANDSHOWER INSTALLATION
(FOR MODEL 7010.901 ONLY)
Drop SPRAY ESCUTCHEON (1) through the fourth hole of the tub ledge (12" max from SPOUT
center) with SPRAY ESCUTCHEON (1) directed towards tub center. Be sure RUBBER RING (2)
is properly seated in ESCUTCHEON (1). Install RUBBER WASHER (3) and LOCKNUT (4) from
underside of ledge.
Secure SPRAY ESCUTCHEON (1) by tightening LOCKNUT (4).
Add SEAL WASHER (5) and connect HOSE (10) to outlet nipple
at the bottom of TEE (7). Tighten firmly.
Slip SHOWER HOSE (8) with COUPLING NUT through SPRAY
HOLDER (6) and ESCUTCHEON (1). ( Note: SPRAY HOLDER (6)
must be separate from ESCUTCHEON (1) to get HOSE (8)
thrrough ESCUTCHEON (1).] Install SEAL (9) and connect both
HOSES (8) and (10). INSTALL second SEAL (9) and connect
HAND SHOWER (11) to SPRAY HOSE (8).
When not in use, HANDSHOWER should be seated
NOTE
in the HOLDER.
7
MAKE WATER SUPPLY CONNECTIONS
Connect HOT water supply to LEFT INLET
UNION (1) and COLD water supply to
RIGHT INLET UNION (2). Pipe connections
are 3/4" NPT. Use sealant or Teflon tape
on pipe connections.
Do not solder directly to valve body.
7A
TEST INSTALLED FAUCET
With HANDLES in OFF position, turn on
WATER SUPPLIES and check all connections
for leaks.
Operate both HANDLES to flush water lines
thoroughly.
Lift HAND SHOWER from HOLDER, direct spray
into tub. Lift TRANSFER KNOB to check HAND
SHOWER and HOSES for leaks.
Turn handles "off" and replace HAND SHOWER.
8
Before the bathroom is completely finished, you may
want to remove spout, handshower, and handles to
avoid damage during construction.
To remove handles, reverse steps in section 4.
To remove SPOUT (1), proceed as follows:
Unthread LIFT ROD KNOB (2) to release it from the
TRANSFER ROD (8). Remove LIFT ROD KNOB (2). VIEW A.
Remove PLUG BUTTON (3) and remove SET SCREW (4)
using 4mm hex wrench supplied.
Lift SPOUT (1) off SHANK (5) carefully and remove RUBBER
RING (6).
Unthread SHANK SLEEVE (7) and remove from SHANK (5).
Reverse sequence to re-install SPOUT (1). Be sure RUBBER
RING (6) is properly seated in its recess at the base of the
SPOUT (1). Make certain SET SCREW (4) is properly aligned
and tight so that SPOUT (1) is locked in place.
CARE INSTRUCTIONS:
DO: SIMPLY RINSE THE PRODUCT CLEAN WITH CLEAR WATER. DRY WITH A SOFT COTTON FLANNEL CLOTH.
DO NOT: DO NOT CLEAN THE PRODUCT WITH SOAPS, ACID, POLISH, ABRASIVES, HARSH CLEANERS, OR A
CLOTH WITH A COARSE SURFACE.
7
5
TRANSFER KNOB
HOT
1
3/4" X 3/4" NPT UNION
(NOT SUPPLIED)
3/4" NPT
IMPORTANT: It is strongly recommended that access be
provided for all enclosed mechanical parts to this system.
1
6
11
10
8
9
HAND
SHOWER
COLD
2
3/4" NPT
2
VIEW "A"
3
4
8
Hex wench
(supplied)
7
5
9
6
1
2
3
4
8
FIG. 1
VIEW "A"
M 9 6 8 5 9 5 R e v . 1 . 2

Advertisement

loading

This manual is also suitable for:

Green tea deck-mount bath filler 7010.901Green tea 7010.900Green tea 7010.901