Echo PB-500 H Operator's Manual page 17

Power blower
Table of Contents

Advertisement

PB-500 H/T
7. Move handle (E) to desired position. Tighten knob (H) hand
tight.
8. Assemble straight pipe (I) onto swivel pipe (C), until you feel
light resistance. Do not force connection. Hold swivel pipe
and turn straight pipe clockwise, engaging positive locking
channels, until connection is firm. Do not force connection.
9. Assemble straight pipe with decal (J) to straight pipe (I) as in
step 8.
Note: Blower use will eventually loosen pipe connections.
Exclusive positive locking system allows pipes to be
tightened. If loosening occurs, remove two straight pipes
and install according to instructions 8 & 9.
X7505200007
© 02/2014 ECHO Inc.
ASSEMBLY
H
E
I
C
For more information
scan this QR code.
E
J
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pb-500 t

Table of Contents