Lenovo ZhaoYang E49 Hardware Maintenance Manual page 70

Lenovo notebook
Hide thumbs Also See for ZhaoYang E49:
Table of Contents

Advertisement

Remove the screws
3
that secure the LCD hinges.
Step
Screw (quantity)
3
M2.5 × 6 mm, flat-head, nylon-coated (6)
When installing:
• Route the antenna cables along the cable guides. As you route the cables, make sure that they are not
subject to any tension. Tension could cause the cables to be damaged by the cable guides, or a wire to
be broken.
• Make sure that the LCD connector is attached firmly and make sure that you do not pinch the antenna
cables when you attach the LCD assembly. Route the LCD cable along the cable guides.
64
Hardware Maintenance Manual
Color
Torque
Silver
4.0 kgf-cm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents