INSTALLA]]ON INSTRUC]]ONS
Gatherthe requiredtoolsand parts be|ore starting installation,
Read and follow the InstTuctlons p rovidedwith any toolslisted
here.
Tools Ele_le_l
m Flat-blade and Phillips
[] Tape measure
screwdrivers
[]
Drillend _/=e" o rsrnallerbit
[]
Level
Through-the-Wall Installation:
In addition to the toolslistedabove, the [ollowingtoolsare
neededIor through-the-wallinstallation.
[]
Saw
[]
1" (2,5cm) orthicker
lumber
[]
Wood preservative
[]
Caulk
[] #10x 1" wood screws (7)
Parts Supplied (on sow== models)
Checkthat all parts ere Included In parts package.
C
D
E
F
H
A. Foam window sash seal
B. [Mndow /oei_ brackets {2)
C. #TO x _" pen-head Phillips
SCreWS(6)
D. #lOx
_ pen-head
Phillips screws (3)
E. 110 x _" round-head screws (6)
F. #TO x _h" pan-head Phillips
SCreWS
(3)
G. Top channel
H. Sidecurtains(2)
L Foam seal
IMPORTANT: Observeall governingcodesand ordinances.
Check the locationwhereair condltJonerwlll b e Installed.Proper
Installation Is your responsibility. Make sureyou haveeverything
necessarylor correctinstallation.
The locationshouldprovide:
[]
Groundedelectzical o uLiet wiLhin4 ft(122 cm) of where the
power cordexits the air conditioner.
NOTE: Do not usean extensioncord.
[]
Free rnovementof air in room to be cooled.
[] A large enoughopeningfor the air conditioner.
[]
Adequatewall supportlorweightol
airconditioner.Air
condil_onerweighs between 94 and 103 Ibs (43 to 47 kg),
NOTE: Cabinet louversmustnot be obstructed. Air mustbe able
to pass freely_reugh _e cabinetlouvers.
A
A. Cabinet louvers
NOTE: Installationparts are suppliedfor double-hungwindows
up to 40' (101.6 crn)wide. A specialWide WindowKiLlsavailable
fromyour dealeror servicecenter.See "Accessories."
P/N 66129901167
1