FERSYSTEM TECH 31 C
The isolation valves and filling kit shown in Fig. 17 is supplied as standard.
1 - The kit consist of the following items shown in fig 17.
2 - Connect the items together as shown in fig. 18. 3 - .....and then connect the completed assembly
Make Up Water
Provision must be made for replacing water lost from the sealed system. Reference should be made
to BS6798, for methods of filling and making up sealed systems. There must be no direct connection
between the boiler's central heating system and the mains water supply. The use of mains water to
charge and pressurise the system directly, is conditional upon the Local Water Byelaws. Again any such
connection must be disconnected after use.
A filling connection is supplied with the valve set in the boiler box.
Attention - is drawn to the Model Water Byelaws.
fig. 17
fig. 18
Cod. 3540U320 - 09/2009 (Rev. 00)
Key
A
Cold water inlet valve
B
Double check valve
C
Blanking cap
D
Removable connection
E
Blanking plug
F
Isolation valve
G
C/H return valve & filter
to the boiler as shown in fig. 19.
fig. 19