Shredder Blade; Debris Bag - Echo ES-255 Operator's Manual

Shred ‘n’ vac
Hide thumbs Also See for ES-255:
Table of Contents

Advertisement

MAINTENANCE
1. Start engine, run at idle for one minute.
2. Complete warm up by running at full throttle for 5 minutes,
operating choke twice to clear air from carburetor chambers.
3. Check idle speed and reset if necessary. If a tachometer is
available, idle speed screw (A) should be set to the
specifications found on "Specifications" Page of this manual.
Turn idle screw (A) clockwise to increase idle speed; counter
clockwise to decrease idle speed.

Shredder Blade

Level 1.
Never remove vacuum tube or open fan guard when
SHRED 'N' VAC
is running or serious personal injury may
®
result. Always wear heavy-duty work gloves when working
in shredder blade area.
1. With engine stopped, remove spark plug wire, remove
vacuum tube from unit.
2. Remove accumulated debris from blade and inspect for
damage.
Do not operate SHRED 'N' VAC
service.
3. Install vacuum tube. Refer to "Install Vacuum Tube and Bag Assembly" in assembly section for correct
assembly procedures.

Debris Bag

Level 1.
Shake dust from bag and inspect for hole or tears. Inspect
zipper and clean debris from teeth to assure complete closing
of zipper.
28
®
if shredder blade is damaged or broken. Return unit to Echo Dealer for
A
X753180307
© 07/2013 ECHO Inc.
ES-255

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shred ‘n’ vac es-255

Table of Contents