Before You Begin; Tools; Unpacking And Inspecting The Module - Cisco OptoStar II Installation Manual

Rf switch module
Table of Contents

Advertisement

Before You Begin

Before you begin the installation procedure, make sure you have all the tools and
the module ready.

Tools

The following tools and equipment are needed to install the module.
• Flat-head or round-head screws and washers
• Flat-head or Phillips-head screwdriver

Unpacking and Inspecting the Module

Please follow the steps below to unpack and inspect the module for any damage:
1.
Inspect the shipping boxes for any damage;
2.
Unpack all boxes and confirm that the contents are complete. Remove the
module;
Note: Items in the packaging box include:
• One OptoStar II RF switch module
• One factory test report
• One Mounting Instruction
3.
Inspect the appearance of the module for any shipping damage. In case of
damage, document it and inform the shipping company and our customer
support. See Customer Support Information (on page 5-1) for details.
4.
Keep the shipping boxes and their inserts for any future shipment for
upgrade or repair.
Note: In the event that the module must be returned to the manufacturer, any
shipment damage resulting from improper packaging will be the
responsibility of the customer. Inspect the boxes and equipment for any
damage upon receipt.
2-2
Installation
OL-29669-01

Advertisement

Table of Contents
loading

Table of Contents