To Assemble Bagger; Bagger Adjustment - Husqvarna CTH150 XP Owner's Manual

Hide thumbs Also See for CTH150 XP:
Table of Contents

Advertisement

NOTE: The strap hook must go through the discharge chute
only. Do not allow the hook to enter the slot in the tractor
back plate. This will allow the dis charge chute to fl oat with the
mower deck when moving on uneven terrain.
TO ASSEMBLE BAGGER (See Figs. 6A &
6B)
NOTE: For ease of assembly, you may wish to obtain the
assistance of another person when putting the bagger
to geth er.
Holes in front bagger tube are at an angle. Place front
bagger tube against lower bagger tube and check for
proper hole alignment before assembling bolts.
Assemble front and lower bagger tubes using four (4)
1/4 x 50,8mm carriage bolts and lock nuts supplied.
Tighten se cure ly.
FRONT BAGGER TUBE
1/4 X 2"
CARRIAGE
1/4 LOCK
BOLTS
NUT
Slide front and lower bagger tube assembly into the
bagger assemby.
Assemble front and upper bagger tubes using four (4)
1/4 x 50,8mm carraige bolts and lock nuts supplied.
Tighten se cure ly.
Slip all the vinyl bindings over the bagger tubes
Slide the bagger dump handle through the hole in the
bagger top, install the clevis pin and secure with retainer
spring.
NOTE: For future use, the clevis pin may be removed in
order to use the handle to clear the chute in the event it
has become clogged.
ASSEMBLY
DIS CHARGE
CHUTE
HOOK
BACKPLATE
SLOT
FIG. 5D
LOWER
BAGGER
TUBE
FIG. 6A
DUMP HANDLE
TUBE
RE TAIN ER
SPRING
1/4 X 2"
CARRIAGE
BOLTS
1/4 LOCK
NUT
FRONT BAG-
GER
TUBE
BAGGER ADJUSTMENT (See Fig. 7)
For proper bag function and appearance, it may be nec-
es sary to adjust the bagger assembly. There should be 6mm
(1/4")-9mm (3/8") gap between the bagger top and fender
and the bagger top surface should be even with the top
surface of the fender. To adjust bagger position:
HORIZONTAL ADJUSTMENT
Slightly loosen the nuts securing the bagger RH and
LH hor i zon tal adjustment brackets. Loosen only enough
so the brackets keep their position, but allow them to
be moved.
Move the brackets the amount forward or back ward you
wish the bag assembly to move. Retighten the nuts
securely.
VERTICAL ADJUSTMENT
Slightly loosen the nuts securing the vertical adjust-
ment brackets. Loosen only enough so the brackets
keep their position, but allow them to be moved.
Move the brackets the amount up or down you wish the
bag assembly to move. Retighten the nuts securely.
Reinstall the bagger as sem bly and check the bagger
to fender fi t. If necessary, repeat the procedure until
proper fi t is attained.
HOR I ZON TAL
AD JUST MENT
BRACKET
VERTICAL
AD JUST MENT
BRACK ET
9
CLEVIS
PIN
FIG. 6B
6MM (1/4") - 9MM (3/8")
TOP SUR-
FACES EVEN
FIG. 7
VINYL
BINDING

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents