Primary/Secondary Gate Movement - Polaris Automatic Gate Operators 500 Series User Manual

Table of Contents

Advertisement

PRIMARY/SECONDARY GATE
MOVEMENT
For dual gate installations the timing of the
gates opening and closing can be adjusted. To
set a dual gate installation for both gates to
open and close simultaneously, set the DIP
switches as follows.
Block 2, DIP 1 – ON position
Block 2, DIP 4 – OFF position
If it is desired to have one gate open and close
prior to the other, this can be accomplished by
adjusting the DIP switch settings.
Block 2, DIP 1 – ON position
Block 2, DIP 4 – ON position
Now determine which gate is desired to open
first and close second. Another DIP switch
adjustment is required to set this.
For primary gate operator (wired to operator 1
terminals) to open first and close second:
Block 2, DIP 5 – OFF position
For secondary gate operator (wired to operator
2 terminals) to open first and close second:
Block 2, DIP 5 – ON position
The delay in opening and closing is always set
for two seconds.
PRIMARY/SECONDARY GATE
MOVEMENT
Control Box Cover
Once you have programmed your
remote/keypad, you can then install the cover
of the control box. Use five #10 x 3/4" screws to
secure the cover to the control box.

Advertisement

Table of Contents
loading

This manual is also suitable for:

700 seriesPolaris 700Polaris 500700500702 ... Show all

Table of Contents