STEP 4
Attach the handlebar foam then fold the trailer arm
4A
Check to see if the handlebar pad is properly attached. If it is not, follow steps 4A and 4B.
4A.
Remove the cover from the foam pad and slide the foam pad over the handlebar
crossbar so the opening is on the bottom.
4B.
Wrap the cover around the foam pad and secure along the bottom edge.
4C.
Loosen the QR skewer on the trailer arm and rotate the plate out of the way.
4D.
Fold the arm under the trailer bike. The handlebar will allow the unit to stand up,
making the remaining assembly steps easier.
STEP 5
Attach the pedals to the cranks
5A
5A.
Locate the right pedal (marked with an "R" at the end of the threaded shaft), and the left
pedal (marked with an "L" at the end of the threaded shaft).
5B.
Thread the right pedal clockwise into the right crank arm (the side with the chain) by
hand. Tighten using an adjustable (or 15mm) wrench.
5C.
Thread the left pedal counter-clockwise into the left crank arm (the side opposite the
chain) by hand. Tighten using an adjustable (or 15mm) wrench.
4B
5B
4C
5C
5
4D