Navman G-PILOT 3100 Installation Manual page 18

Hide thumbs Also See for G-PILOT 3100:
Table of Contents

Advertisement

Installation
1
Find a suitable location and arrangement for the unit as described above.
2
Choose, assemble and fi t a suitable rudder linkage.
3
Fit the unit as shown below:
Set rudder
If necessary,
amidships.
mount base on
block to set height.
If necessary, cut connecting
rod at this end, then replace
coupling and lock nut.
4
Wire the cable back to the main unit, following the wiring guide (see section 3-2-2).
18
Rotate base so arrow on arm
points near centre line on
base. Fit two screws provided
loosely in middle of slots.
Join coupling to
rudder linkage.
Holes in the bulkheads
must be at least 18.5 mm
(0.73") diameter.
NAVMAN
Rotate base so arrow on
arm points to centre line
on base. Fit third screw
provided, tighten all screws.
Ensure rudder
is amidships.
Snap end into
correct hole in
arm.
Plug connector into socket
Main unit
G-PILOT 3100 Installation Manual

Advertisement

Table of Contents
loading

Table of Contents