List of Figures Bracket Hardware...........................7 Installing the Cable Management Brackets..................9 Securing an InfiniBand Cable Using a Velcro Strap..............10 List of Figures...
1 Preparing for Installation 1.1 Audience This guide is intended for HP service representatives and other persons trained to install hardware options in HP 10000 series racks. Such persons are expected to understand the hazards of working in this environment and to take suitable precautions to minimize danger to themselves and others.
Figure 1-1 Bracket Hardware • The fasteners that are specified in Table 1-1. Table 1-1 Fasteners (Supplied with Cabinet Mounting Hardware) Qty. Size Format Torque Description M6 cage nuts Square nut Cage nut for M6 screw M6 x 16mm pan Posidrive 25-30 Machine screw...
1.6 Prerequisites Before you begin to mount the bracket: • Follow the usual cable-handling precautions for InfiniBand cables, see the HP Cluster Platform InfiniBand Interconnect Installation and User's Guide. • Ensure that you know how to plug in the InfiniBand cables, as described in the documentation that came with your InfiniBand device.
2 Installing the Cable Management Kit The location of the cable management kit depends on the rack position occupied by the server chassis. Align each bracket with the InfiniBand connector ports on the server so that the bracket's mounting flange is level with the InfiniBand ports. 2.1 Installing the Cable Management Kit To install the cable management kit, follow these steps: Identify and mark the two holes in the rack's rear mounting rails (callouts 1 and 3 in...
Figure 2-2 Securing an InfiniBand Cable Using a Velcro Strap Properly installed, this cable management kit provides the necessary strain relief for the InfiniBand connections and maintains a minimum 4-inch bend radius for the InfiniBand cables. Installing the Cable Management Kit...