LG LCRT2010ST Service Manual page 21

Hide thumbs Also See for LCRT2010ST:
Table of Contents

Advertisement

COMPONENTS
RELAY 2
FAN MOTOR
(Wire leads removed)
TURNTABLE
MOTOR
(Wire leads removed)
NOTE : • A MICROWAVE LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS
SERVICED FOR ANY REASON.
• MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.
• WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE TO GRASP THE
CONNECTOR, NOT THE WIRES.
TEST PROCEDURE
Check for continuity of relay 2 with an
ohm-meter.
(Remove wire leads from relay 2 and
operate the unit.)
Measure the resistance.
(Ohm-meter scale: R x 1)
Measure the resistance.
(Ohm-meter scale: R x 1)
5-11
RESULTS
POWER
LEVEL
1
4 sec
2
6 sec
3
8 sec
4
10 sec
5
12 sec
6
14 sec
7
16 sec
8
18 sec
9
20 sec
10
22 sec
Normal:
A:Approx. 85 ~ 100 ohm.
B:Approx. 10 ~ 25 ohm.
Abnormal: Infinite or several
ohm.
Normal: Approx. 100 ~ 150 ohm
Abnormal: Infinite or several
ohm.
18 sec
16 sec
14 sec
12 sec
10 sec
8 sec
6 sec
4 sec
2 sec
0 sec

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents