NEC Express 5800 User Manual page 69

Express5800 system rack
Hide thumbs Also See for Express 5800:
Table of Contents

Advertisement

Index
A
Air Conditioning, 2-9
Cooling Capacity, 2-9
B
Blank Panels
installing, 5-17
C
Cable Restrictions
RAID, 3-3
Cable Summary, 3-2
Cabling Constraints, 3-2
Concentrator
installing, 5-14
Concentrator Cable Lengths, 3-3
Configuration Assistant, 1-2
E
Electrical Facilities, 2-10
Environmental Conditions, 2-4
Equipment Location
Location, equipment, 2-2
G
Grounding Requirements, 2-11
Guide, using, v
K
Keyboard Tray
installing, 5-13
M
Monitor
connecting.
Monitor Tray
installing.
P
Power Distribution Unit
installing, 5-12
requirements, 2-10
R
Rack
Configuration Guidelines, 3-6
Floor Requirements, 2-5
leveling, 4-7
opening doors, 4-5
Space Requirements, 2-2
Spacing Components, 3-3
unpacking, 4-3
Rack Components
installing, 5-3
Rack Frame Link Kits
installing, 4-8
Rack Stabilizer
installing, 4-10
Related Documents
Documents, related, vi
S
Safety Notices, vii
Server
master and protected, 5-10
Side Panels
removing, 4-6
System
configuring, 4-10
System Rack Models
Rack Models, 1-2
System Rack Placement, 2-7
System Rack, 42U, 1-3
System Rack, Multi-Bay, 1-5
T
Text Conventions, vi
Typical Configuration, 5-2
U
Uninterruptible Power Source (UPS, 2-10
UPS
installing, 5-4
Interface Expander Accessory, 5-6
Load Calculation and On-Battery Run time,
3-8
Index-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

42u36u27u

Table of Contents