Download Print this page

GE 31-16223 Installation Manual page 2

Comercial stacked gas dryers

Advertisement

iNSTALLATiON
Preparing
the installation Site and Unpacking the Dryer
1. Prepare the area and exhaust for installation of the new' dryer.
2.Check to be sure that the existing external exhaust is clean and that it meets attached installation specifications.
&Using the four shipping carton corner posts as padding (two on each side), carefully lay the dryer on its left side
and remove foam shipping pad.
4. Return the dryer to an upright position.
5. Move the dryer to the desired location.
CAUTION:
FOR PERSONAL
SAFETY,
STACKED
iTS MUST BE FASTENED
SECURELY
TO WALL.
r
THE DRYER
MUST
NOT BE iNSTALLED
OR STORED
iN
AN AREA WHERE
iT WILL BE EXPOSED
TO VVATER
AN D/O R WEATH E R.
PLEASE
PROVIDE
ADEQUATE
SPACE
FOR OPERATING
AND SERVICING.
_WARNING:
Personal
injury Hazard
Because
of its weight and size, more than
one person
is required
to lift, tilt or move the washer/dryer.
Failure to do so may result
in personal
injury.
STEP 1
Attach two chains using Phillips
head screws
to each end of
upper unit cabinet.
STEP 2
Locate two wall studs behind desired
operating
location of
stacked
units.
NOTE: For wall studs
not appropriately
spaced,
see section
for Alternate
Method for Installation
of Wall Hooks.
STEP 3
Screw two wall hooks into two wall studs (same height as
chain connections
on cabinet
of upper unit). Both chains
should
pull straight
back to wall studs or angle outward.
NEITHER
chain should
angle inward.
NOTE: The final construction
must withstand
a pull of 200 Ibs.
STEP 4
Connect
both dryers to gas supply.
(See GAS CONNECTION
INFORMATION
of this
instruction.)
STEP 5
Connect
both dryers to power supply. (See ELECTRICAL
CONNECTION
INFORMATION
section
of this instruction.)
STEP 6
Connect
both dryers to external
exhaust.
(See EXHAUST
INFORMATION
section
of this instruction.)
STEP 7
Hook both chains from upper unit to appropriate
wall hooks
taking up any slack.
STEP 8
Adjust all 4 levelling
legs. Dryer must be levelled
and rest
firmly on all 4 levelling
legs.
REAR ViEW
ATTACH CHAINS HERE
STEP 2
SIDE VIEW
4 LEVELLING
LEGS

Advertisement

loading