Installing The Hardware; Installing The Z9000 Chassis In A Rack Or Cabinet; Attach Mounting Brackets - Dell Force10 Z9000 Quick Start Manual

Dell force10 z9000 system quick start guide
Hide thumbs Also See for Force10 Z9000:
Table of Contents

Advertisement

Installing the Hardware

This guide assumes all site preparation has been performed before installing the
chassis.
Installing the Z9000 Chassis in a Rack or
Cabinet
To install the Z9000 system, Dell Force10 recommends that you complete the
installation procedures in the order presented below.
Always handle the system and its components with care. Avoid dropping the
Z9000 chassis or its field replaceable units.
For proper ventilation, position the Z9000 chassis in an equipment rack (or
cabinet) with a minimum of five inches (12.7 cm) of clearance around exhaust
vents. When two Z9000 systems are installed near each other, position the two
chassis at least 5 inches (12.7 cm) apart to permit proper airflow. The acceptable
ambient temperature ranges are listed in the Environmental Parameters section.
CAUTION: Always wear an ESD-preventive wrist or heel ground strap when
handling the Z9000 and its components. As with all electrical devices of this
type, take all necessary safety precautions to prevent injury when installing
this system. Electrostatic discharge (ESD) damage can occur if components
are mishandled.

Attach Mounting Brackets

The Z9000 is shipped with mounting brackets (rack ears) and required screws
for rack or cabinet installation. The brackets are enclosed in a package with the
chassis.
Step
Task
Take the brackets and screws out of their packaging.
1
Installing the Hardware
1
5

Advertisement

Table of Contents
loading

Table of Contents