Assembly - Samsung SGH-E490 Service Manual

Gsm telephone
Hide thumbs Also See for SGH-E490:
Table of Contents

Advertisement

Exploded View and Parts List

2-4. Assembly

1
Put MOT, CAM, SPK.
1. Put LCD ASS'Y to LOWER.
2. Put MOT, RECEIVER, CAM, SPK.
3. Arrange a F-PCB to a groove.
※ caution
1. Beware that you do not leave any dirty thing
on LCD (dust,fingerprint and etc.).
2. Arrange MOT, RECEIVER WIRE not to be
interfered with other components.
3
SCREW(2POINT)
1.Drive SCREWs to LOVWER. (M1.4*L3 2 POINT)
2. Attach SCREW CAP.
※ caution
1.Check Right and Left. The shape is different.
Left
Arrange Wire.
Put SPKs and a CAM.
SCREW CAP
Right
SAMSUNG Proprietary-Contents may change without notice
This Document can not be used without Samsung's authorization
2
1.Join UPPER to LOWER.(Refer to the Picture)
※ caution
1. Be sure that UPPER is hooked on LOWER
4
KEY F-PCB
GUIDE
HOLE
1. Attach KEY F-PCB to FRONT.
Insertion order (VOL KEY → MIC → KEY CON. →
CAM KEY)
2. Set KEY PAD on KEY F-PCB.
※ caution
1. Beware that you do not damage KEY F-PCB.
2. Be caredful that you do not make scratch when
you assemble a Hinge.
3. Check folder Tention and F-PBC connected
with accuracy.
2-11
FOLDER
UPPER

Advertisement

Table of Contents
loading

Table of Contents