Existing Version 5 Topology With Consumers And Hubs Migrated; Isolating The Master From The Topology - Sun Microsystems Sun Java SystemDirectory Server Migration Giude

Table of Contents

Advertisement

8. Enable the replication agreements from the master to the hubs and other masters in the
topology.
9. If you have migrated the data, check that replication is in sync.
10. If you have not migrated the data, reinitialize the master from another master in the
topology.
11. If you rerouted client applications (Step 2), you can now route the applications to write to
the migrated master.
The following sequence of diagrams illustrate the migration of a master, as described above.
The first diagram shows the version 5 topology before the migration of the masters.
5.x Master A
6.0 Hub A
6.0 Consumer A

Existing version 5 Topology With Consumers and Hubs Migrated

FIGURE 4–9
The first step in migrating a master involves disabling replication agreements, effectively

isolating the master from the topology.

Chapter 4 • Migrating a Replicated Topology
5.x Master B
6.0 Hub B
6.0 Consumer B
Sun Confidential: Registered
Migration Scenarios
61

Advertisement

Table of Contents
loading

Table of Contents